CHALLENGE · SOLUTION · RESULTS
Project Overview
Challenge
The existing circulating water system had been in service for years with obvious scaling and corrosion tendency. The client wanted a green retrofit without large-scale shutdown or system rebuild.
Solution
A compact GJQ-S-100 was selected for its small footprint and flexible connections, installed and commissioned within a short shutdown window.
Results
Average total hardness removal reached 36.09% and calcium hardness removal 55.79%; all indicators stably compliant with no chemical dosing throughout.